01 / POST-CONSTRUCTION CLEANING
What an agreed final clean can include
High-to-low removal of ordinary construction dust from safely reachable finished surfaces, trim, doors, baseboards, ledges, switch plates and fixture exteriors; kitchen counters, sinks, fixtures and agreed cabinet/drawer interiors; bathroom vanities, mirrors, toilets, tubs/showers and accessible fixtures; approved rooms, closets and utility areas; vacuuming and finish-appropriate damp-mopping.
Interior glass, window tracks and other detailed work are included only when the quantity, condition and access are identified in the written scope. We finish with a visual scope check.
02 / POST-CONSTRUCTION CLEANING
Make sure the site is ready
Before scheduling, we confirm safe entry, working water and electricity, remaining trade activity and whether heavy debris has been removed. Ongoing sanding, cutting, painting or other work can introduce fresh dust and change the cleaning requirements. Let us know what will still be happening at the property.
03 / POST-CONSTRUCTION CLEANING
Separate phases and specialty work
Our standard offer is a final clean. Rough cleaning and touch-up return visits are separately assessed and quoted. A return visit after trades re-enter is not automatically included.
Heavy debris and off-site hauling, extensive paint overspray, adhesive or grout-haze removal, hazardous-material remediation, high-access exterior glass, ladder/roof work, duct interiors, carpet extraction and floor restoration are outside the standard scope. Report unusual residues so we can assess the appropriate next step before work.
04 / POST-CONSTRUCTION CLEANING
A quote based on the actual project
Send the location, approximate size, project type, current photos or video, desired completion date and areas requested. We review fine-dust levels, finishes, glass, cabinets, residue, access and readiness. A walkthrough may be needed before a written quote.